2277 Longyang Rd. Pudong, Shanghai, China info@mixingchina.com
The new generation of LBK2000 series products independently developed by NFLG can realize frequent relocation and adapt to the working conditions of rapid relocation and installation of construction sites. It is mainly for overseas markets and domestic small-scale new repair and maintenance asphalt markets.
Model | LB2000K |
Rated output | 160t/h |
Cold bin | 5x10m³ |
Screen layers | 5 layers |
Mixer | 2000kg |
Installation time | 7 working days |
Installed power | 415kW |
The ladder and aggregate elevator are integrated. And the design of dust collector placed above the drum is integrated with the fume, which saves space and is convenient for disassembly and assembly.
Centralized wiring of electrical components can realize quick connection between modules, without lifting on site, and shorten installation time.
The whole plant adopts steel structure foundation, and the ground can be compacted and leveled according to the bearing requirements, so as to avoid the need of re-excavation of foundation and other processes for equipment relocation, which will save the installation cycle and put into production quickly.
The handrail of the main building adopts the socket type, which is installed in place at one time, and is folded directly for relocation without disassembly. Compared with the traditional bolt butt type, it can realize rapid relocation and efficient installation.
With the module design, the tank can be connected quickly, heated evenly and with good insulation. It will avoid coking, deterioration and carbonization caused by over temperature of heating materials, which is effectively reducing energy consumption.